Fujinon
Fujinon Megapixel - 1/3" 3MP Auto Iris 15-50mm, long lead - YV3.3x15SA-SA2L
Fujinon Megapixel - 1/3" 3MP Auto Iris 15-50mm, long lead - YV3.3x15SA-SA2L
SKU:YV3.3x15SA-SA2L
Regular price
$162.59 NZD
Regular price
$336.00 NZD
Sale price
$162.59 NZD
Unit price
/
per
* All prices exclude GST & Freight, Calculated at checkout - supply only*
Low stock: 2 left
Key Features
- Telephoto Long Focal Length
- DC Auto Iris
- ND Filter
- Aspherical Lens Construction
- Metal Mount
- Wide Aperture Ratio of F1.5
- Cable Length of 0.75' (230mm)
The YV3.3x15SA-SA2 CS-Mount 15 to 50mm 3.3x Optical Zoom Lens for CCTVs from Fujinon is well suited for high-quality image capturing and offers optical performance support up to 3MP. With a focal length of 15 to 50mm, a wide area is covered during surveillance. The high-accuracy aspherical construction, and low-dispersion, high refractive-index glass enhance optical performance. With the built-in ND filter, output is enhanced for high-sensitivity cameras.
Share
Subscribe to our newsletters
Be the first to know about new products and receive exclusive offers.